This section contains information about the Port Augusta to Whyalla Railway.
2.1886 | Port Augusta 0 m - narrow gauge [SAR PTT 2.1886] |
30.10.1914 | Accounting Stations [MN 2/14] |
2.1917 | Port Augusta 0 m - narrow gauge CAR [SAR PTT 2.1917] |
12 & 15.11.1917 | List of Open Stations [NAA B300/6 5981 Pt 1] |
1.5.1924 | Crossing Loop 1200 ft[GA] |
30.6.1924 | Electric Staff Station by[Annual Report] |
1.8.1932 | Goods Sidings 21,800 ft[GA] |
11.1934 | Port Augusta 0m - narrow gauge CAR [SAR PTT 11.1934] |
12.7.1937 | 56 m [SAWN 27/37] |
1.10.1937 | Port Augusta 56 miles - [MN 136/37] |
1.11.1939 | Port Augusta 56 m 28 c 45l - [Goods & Livestock] |
1.3.1950 | Loop 1200 ft., Sdgs 21,800 ft.[GA] |
6.1953 | Port Augusta 0 m - narrow gauge [SAR PTT 6.1953] |
1.1.1961 | Port Augusta 56 m 28 c - Pass. Fares & Goods Rates Books |
25.1.1961 | Drawer Locks remain at Wheel Truing Yard (Up end) and Tassie St[WGC 4/61] |
1.11.1962 | Port Augusta 56¼m - Train Order replaced Electric Staff Port Augusta - Tarcoola 11/11/62 [WN 44/62] |
23.9.1966 | 3 ft 6 ins gauge Track removal to Stirling North[WN 38/66] |
2.1973 | Port Augusta 0 m - narrow gauge CAR [PTT 2.1973] |
2.7.1973 | Port Augusta 92 km - 92 km in Pass. Fares 1.7.1973, and in WTT 14.10.1973 Loop 366 m[Metrication] |
17.8.1975 | Station in Fast & Slow Mixed Service[Advert.] |
1.7.1979 | Port Augusta 92 km - Engine stabling depot - Fuel station - Turntable - Refreshment room - Crossing loop 366 m - Carriage watering station - ANR WTT 1.7.1979 |
17.1.1988 | Stirling North - Pt Augusta Train Order replaces Electric Staff by 17.1.1988 [WTT] |
1.6.1989 | Pt Augusta - Spencer Jcn Train Order 6.6.1989 (Typo WTT 17.1.1988)WN 22/89 |
30.06.1914 | Mentioned in Annual Report as "Tassie Street" |
27.11.1914 | Depot (Tassie Street) - Loads of Goods Trains [MN 3/14] |
4.12.1958 | Level Crossing 56 m 73 c[WN 49/58] |
20.4.1972 | Whyalla Line Jcn near Tassie St - Open, probably ES [WN 16/72] |
16.10.1972 | Called Tassie Street in this WTT [WTT Temp] |
21.9.1972 | Whyalla Jcn. 57 m 75 c - Open 25.9.1972, probably ES [WN 38/72] |
28.9.1972 | Line to Whyalla open 6.10.1972 [WN 39/72] |
26.10.1972 | Renamed Spencer Jcn [WN 43/72] |
26.10.1972 | Renamed from Whyalla Jcn [WN 43/72] |
2.7.1973 | Spencer Junction 95 km approx. - 95 km in WTT 14.10.1973 [Metrication] |
14.10.1973 | Electric Staff Station by [WTT] |
26.9.1974 | 95.2km approx [WN 38/74] |
1.7.1979 | Spencer Junction Jst 95 km - Crossing loop ANR WTT 1.7.1979 |
1.6.1989 | Pt Augusta - Spencer Jcn Train Order 6.6.1989 (Typo WTT 17.1.1988) WN 22/89 |
1.7.1979 | Ballast Siding 110.5 km - Unattended - Good Loop 366 m ANR WTT 1.7.1979 |
1.7.1979 | Lincoln Gap 121.5 km - Unattended - Crossing loop 1529 m - ANR WTT 1.7.1979 |
1.7.1979 | Whyalla 168 km (76 km from Port Augusta)- Resthouse for trainmen - Carriage watering station - Crossing loop ANR WTT 1.7.1979 |