Port Pirie to Port Augusta
The Trans-Australian line construction commenced in 1912 with the first through train running in 1917. It is standard gauge and is the link between the railways of Australia's eastern states and that of Western Australia. Construction of the 1,691km (1,051 miles 68 chains) of 1,435 mm (4ft 8½in) gauge line from Port Augusta, South Australia, to Kalgoorlie, Western Australia.
The extension from Port Augusta to Port Pirie, which was opened in 1937, is 90km (56 miles 28 chains) long.
14.9.1912 | Turning the First Sod, By His Excellency the Governor General, Lord Denman, at Port Augusta |
17.10.1917 | Track laying machines met near Ooldea |
22.11.1917 | First train |
26.7.1937 | Extension of line from Port Augusta to Port Pirie opened. |
This section contains information about the Trans-Australian railway from Port Pirie to Port Augusta.
(A lot of the information in this section is from original notes by Peter Barry)
Port Pirie Junction (134.24 m) -- Port Pirie Junction (0 m)
23.7.1937 | Opened - loop 1530 ft., sidings 18,440 ft[annual report] |
26.7.1937 | Extension of line from Port Augusta to Port Pirie officially opened. |
30.6.1937 | Drawer locks remain at Port Augusta leg of Triangle & Stockyards ("Prairie") 0 m 50 c[WGC 4/61] |
5.11.1967 | Train order Port Pirie Junction - Stirling North [WN 44/67] |
12.11.1967 | Port Pirie Junction Closed & Port Pirie Opened. Mileage Difference 1 m 0 c [WN 44/67] |
Port Pirie - Ellen Street (135.65 m)
Port Pirie - Mary Elie Street 262.5 km (0 m) -- Port Pirie 362.5 km
12.11.1967 | Port Pirie Junction Closed & Port Pirie Opened. Mileage Difference 1 m 0 c [WN 44/67] |
12.1.1970 | Standard Gauge to Broken Hill open [SAR WN50/69] |
1.7.1979 | Port Pirie 262.5 km (from Adelaide) - Resthouse for trainmen - Engine stabling depot - Fuel station - Turntable - - Refreshment room - Crossing loop - Carriage watering ANR WTT 1.7.1979 |
28.10.1990 | Port Pirie 362.5 km [WWT Admt 28.10.1990] |
6.10.1991 | Port Pirie - turntable 25.9m [WWT Admt 6.10.1991] |
Coonamia 359.5 km -- Coonamia 225 km
12.1.1970 | Coonamia West Junction - Yard Connection opened (Broken Hill Line open) to 18/7/70.[WN 27/70] |
9.4.1978 | Coonamia North Junction - Opened [WN 14/78] |
9.4.1978 | Coonamia East Junction - Opened.[WN 14/78] |
28.10.1990 | Coonamia 359.5 km [WWT Admt 28.10.1990] |
23.3.1992 | Coonamia Siding (225 km from Adelaide) [WWT Admt 23.3.1992] |
4.8.1993 | Coonamia West Junction - closed [SN 30/93] |
Weeroona (7 m 38 c 64 l)
1.10.1937 | Open as 7 m 38ch[MN 136/37] |
1.11.1939 | Mentioned as 7 m 37ch 64l[MN 136/37] |
1/07/1950 | Last mentioned [Pass. Fares] |
Port Germein 25.5 km (14 m 76 c 78 l)
23.7.1937 | Opened 14 m 76ch 78l[Annual Report] |
6.6.1938 | Distance rounded to 15 m - Not Electric Staff Station[Working Time Table] |
1.11.1939 | Port Germein 14 m 56 c 89 l[Goods & Livestock] |
7.8.1944 | Port Germein 14¾ m - Unattended Electric Staff Station[Working Time Table] |
1.3.1950 | Port Germein 14¾ m - Unattended Electric Staff Station - loop 1580 ft., goods siding 924 ft |
24.9.1953 | Loop 1214 ft[WGC 39/53] |
24.7.1958 | Loop now 2550 ft[WGC 30/58] |
1.1.1961 | Port Germein 14 m 57 c [Pass. Fares & Goods Rates Books] |
25.1.1961 | 3 Staff Locks removed[WGC 4/61] |
6.1961 | Port Germein 14¾ - Unattended Electric Staff Station |
2.11.1967 | Train Order Port Pirie Junction - Stirling North - Unattended Crossing Station[WN 44/67] |
2.11.1972 | Extension: North Points 15 m 49 c 44ft; South 14 m 45 c 50ft. Loop 5175ft (44 ft = 66.7 links, 50 ft = 75.8 links)[WN 44/72] |
2.7.1973 | 25 km in Pass. Fares 1.7.1973, 24.5 km in WTT 14.10.1973 Loop 1577m[Metrication] |
1.7.1979 | Port Germein 25.5 km - Unattended - Crossing loop 1577 m - ANR WTT 1.7.1979 |
Baroota 34.5 km (20 m 30 c 0 l)
6.06.1938 | Open[SA WN 22/38] |
1.11.1939 | [Goods & Livestock] |
1.03.1950 | Baroota 20 m 52 c 0l - No Siding[GA] |
1.06.1961 | [Pass. Fares & Goods Rates Books] |
7.1975 | Baroota 20 m 52 c - In public timetable July 75 & March 76 (1557 ex Sydney) |
1.7.1973 | 35 km in Pass. Fares 1.7.1973, 34.5 km in WTT 14.10.1973[Metrication] |
1.7.1979 | Baroota 34.5 km - Unattended - ANR WTT 1.7.1979 |
30.8.1979 | Baroota 34.5 km - Mentioned in WTT Times[WN 35/79] |
11.6.1981 | Delete all reference[WN 23/81] |
Mambray Creek 45 km (26 m 74 c 78 l)
23.7.1937 | Open[Annual Report 1937] |
1.11.1939 | In Goods & Livestock book |
1.3.1950 | Goods Siding 340 ft[GA] |
1.1.1961 | Mambray Creek 26 m 75 ch[Pass. Fares & Goods Rates Books] |
1.2.1961 | Staff Locks Removed[WGC 4/61] |
3.11.1968 | In Public Timetable 3.11.1968 to Nov 1979 |
5.11.1967 | Unattended Emergency Crossing Station, Goods Loop 401 ft |
2.11.1967 | Mambray Creek 27 m - Train Order Port Pirie Junction - St North 5/11/67[WN 44/67] |
25.4.1968 | 5128 ft Loop open 22.4.1968[WN 17/68] |
16.5.1968 | Loop now 5048 ft 26 m 43 c 93L to 27 m 43 c 06L[WN 20/68] |
3.11.1968 | Unattended Crossing Station, Loop 5040 ft[WTT Amdt] |
2.7.1973 | 45 km in Pass. Fares 1.7.1973, and in WTT 14.10.1973 Loop 1536 m[Metrication] |
1.7.1979 | Mambray Creek 45 - Unattended - Crossing loop 1536 m - ANR WTT 1.7.1979 |
24.1.1985 | Goods siding closed 13.12.1984[WN 3/85] |
Nectar Brook 60.5 km (36 m 69 c 28 l)
30.6.1937 | Open 23.7.1937 [Annual Report] |
6.6.1938 | Nectar Brook 37 m - Unattended Electric Staff Station by[Working Time Table] |
1.11.1939 | Goods & Livestock book |
24.9.1953 | Loop 1367 ft[WGC 39/53] |
1.3.1950 | Loop 1400 ft, Goods Siding 369 ft[GA] |
4.12.1955 & 24.6.1956 | Loop 1367 ft[WTTs] |
24.07.1958 | Loop now 2309 ft [WGC 30/58] |
1.1.1961 | Pass. Fares & Goods Rates Books |
25.1.1961 | Staff Locks Removed 2.2.1961[WGC 4/61] |
21 & 28/2/63 | Loop 2339 ft (May be Typo)[WN 7 & 8/63] |
2.11.1967 | Train Order Port Pirie Junction - Stirling North 5.11.1967[WN 43 & 44/67] |
5.11.1967 | Nectar Brook 36 ¾m - Unattended Crossing Station |
9.11.1972 | Extn: North Points now 37 m 35c. Loop 3850ft 15.11.1972 [WN 45/72] |
22.3.1973 | Extension: South Points now 36 m 72 c 15.2.1973 5128ft [WN 10 & 12/73] |
2.7.1973 | Nectar Brook 60.5 km - 61 km in Pass. Fares 1.7.1973, 60.5 km in WTT 14.10.1973. Loop 1563 m [Metrication] |
1.7.1979 | Nectar Brook 60.5 km - Unattended - Crossing loop 1563 m - ANR WTT 1.7.1979 |
14.8.1986 | Temp Closed 5/8/86, closed as Block Stn [WN 30 & 32/86] |
4.8.1985 | Last Entry[WTT] |
17.8.1986 | shown in [WTT Amdt] |
Winninowie 71.5 km (42 m 74 c 25 l)
30.06.1937 | Open 23.7.1937[Annual Report] |
1.11.1939 | [Goods & Livestock] |
1.3.1950 | Goods Siding 369 ft[GA] |
1.1.1961 | Winninowie 42 m 74 c - Pass. Fares & Goods Rates Books |
25.1.1961 | Staff Locks Removed 2.2.1961[WGC 4/61] |
23.2.1970 | In Public Timetable 23.2.1970 to August 1973, November 87 to March 94 |
2.11.1967 | Train Order Port Pirie Junction - Stirling North 5.11.1967[WN 43 & 44/67] |
5.11.1967 | Winninowie 43 m - Unattended Emergency Crossing Station, Loop 500 ft |
20.2.1969 | Now 43½m ex PP(Careful) Loop now 5470 ft [WN 8/69] |
2.7.1973 | Winninowie 71.5 km - 74 km in Pass. Fares 1.7.1973, 71.5 km in WTT 14.10.73 Loop 1667 m[Metrication] |
1.7.1979 | Winninowie 71.5 km - Unattended - Crossing loop 1667 m - ANR WTT 1.7.1979 |
Quorn Road (50 m 67 c)
23.07.1961 | RMSP Opened 2.1957. In WTTs 23.7.1961 to 12.11.1967[WTT] |
6.2.1969 | RM cancelled[WN 6/69] |
Stirling (4 m 19c) -- Stirling (52 m 08 c 64l) -- Stirling North 85 km (52 m 09 c)
2.1886 | Stirling 4¼ m - narrow gauge CAR [SAR PTT 2.1886] |
2.1917 | Stirling 4¼ m - narrow gauge CAR [SAR PTT 2.1917] |
11.1934 | Stirling 4¼ m - narrow gauge CAR [SAR PTT 11.1934] |
- | Stirling - narrow gauge 4 m 19 c |
18.6.1936 | Stirling 52 m 08 c 64l - Dual Gauge Open [mn 131/36] |
6.6.1938 | Stirling 52 m - Attended Electric Staff Station (Non Crossing on S.G.) [Working Time Table] |
1.11.1939 | Stirling 52 m 8 c 64l - [Goods & Livestock] |
1.3.1950 | No Loop SG, 12,500ft Sidings[GA] |
18.9.1952 | Dual Gauge to Power Station open[WGC 38/52] |
6.1953 | Stirling 4¼ m - narrow gauge CAR [SAR PTT 6.1953] |
16.12.1954 | Stirling North 52 m 09 c - Renamed Stirling North[WGC 50/54] |
1.1.1961 | Pass. Fares & Goods Rates Books |
23.9.1966 | 3 ft 6 ins gauge Track removal to Port Augusta [WN 38/66] |
2/11.1967 | Train Order Port Pirie Junction - Stirling North 5.11.1967 [WN 43 & 44/67] |
16.10.1972 | Again shown as Stirling North[WTT temp.] |
2.7.1973 | Stirling North 85 km - 85 km in Pass. Fares 1.7.1973, and in WTT 14.10.1973 [Metrication] |
1.7.1979 | Stirling North 85 km - Carriage watering station ANR WTT 1.7.1979 |
25.10.1987 | Last ES[WTT] |
17.1.1988 | Stirling North - Pt Augusta Train Order replaces Electric Staff by 17.1.88 [WTT] |
Port Augusta Racecourse (53 m 28 c)
1937 | Races late in 1937[TT in Local paper] |
c 1985 | ANR Era Special last stopped here 1984 |
Cudmore Hill Road (55 m 24 c)
23.7.1961 | RMSP Opened 2/57 In WTTs 23.7.1961 to 12.11.1967[WTT] |
6.2.1969 | RM cancelled[WN 6/69] |
Port Augusta (0 m 00 c) -- Port Augusta 92 km (56 m 28 c 45l)
2.1886 | Port Augusta 0 m - narrow gauge [SAR PTT 2.1886] |
30.10.1914 | Accounting Stations [MN 2/14] |
2.1917 | Port Augusta 0 m - narrow gauge CAR [SAR PTT 2.1917] |
12 & 15.11.1917 | List of Open Stations [NAA B300/6 5981 Pt 1] |
1.5.1924 | Crossing Loop 1200 ft[GA] |
30.6.1924 | Electric Staff Station by[Annual Report] |
1.8.1932 | Goods Sidings 21,800 ft[GA] |
11.1934 | Port Augusta 0m - narrow gauge CAR [SAR PTT 11.1934] |
12.7.1937 | 56 m [SAWN 27/37] |
1.10.1937 | Port Augusta 56 miles - [MN 136/37] |
1.11.1939 | Port Augusta 56 m 28 c 45l - [Goods & Livestock] |
1.3.1950 | Loop 1200 ft., Sdgs 21,800 ft.[GA] |
6.1953 | Port Augusta 0 m - narrow gauge [SAR PTT 6.1953] |
1.1.1961 | Port Augusta 56 m 28 c - Pass. Fares & Goods Rates Books |
25.1.1961 | Drawer Locks remain at Wheel Truing Yard (Up end) and Tassie St[WGC 4/61] |
1.11.1962 | Port Augusta 56¼m - Train Order replaced Electric Staff Port Augusta - Tarcoola 11/11/62 [WN 44/62] |
23.9.1966 | 3 ft 6 ins gauge Track removal to Stirling North[WN 38/66] |
2.1973 | Port Augusta 0 m - narrow gauge CAR [PTT 2.1973] |
2.7.1973 | Port Augusta 92 km - 92 km in Pass. Fares 1.7.1973, and in WTT 14.10.1973 Loop 366 m[Metrication] |
17.8.1975 | Station in Fast & Slow Mixed Service[Advert.] |
1.7.1979 | Port Augusta 92 km - Engine stabling depot - Fuel station - Turntable - Refreshment room - Crossing loop 366 m - Carriage watering station - ANR WTT 1.7.1979 |
17.1.1988 | Stirling North - Pt Augusta Train Order replaces Electric Staff by 17.1.1988 [WTT] |
1.6.1989 | Pt Augusta - Spencer Jcn Train Order 6.6.1989 (Typo WTT 17.1.1988)WN 22/89 |