This section contains information about the Alawoona to Barmera railway
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
3.6.1990 | Alawoona 243.5 km - In "Australian Nation Working Time Table 3.6.1990" [ANWTT 3.6.1990] |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
3.6.1990 | Meribah 276 km - In "Australian Nation Working Time Table 3.6.1990" [ANWTT 3.6.1990] |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
3.6.1990 | Taldra 317.5 km - In "Australian Nation Working Time Table 3.6.1990" [ANWTT 3.6.1990] |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
- | This station not on the main "Barmera Line". It was on a branch line from "Wonuarra" that was 17 miles long that was built to service construction of proposed "Chowilla Dam". |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
3.6.1990 | Paringa 340.5 km - In "Australian Nation Working Time Table 3.6.1990" [ANWTT 3.6.1990] |
- | Calperum Siding - On "Map Showing Lines of Railways in South Australia" undated Chief Engineer for Railways |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
- | Riverland Siding - On "Map Showing Lines of Railways in South Australia" undated Chief Engineer for Railways |